RARIK · Distribution system operator

Increasing grid capacity with battery storage

System design, requirements and procurement of a 1 MW / 2 MWh battery that increases usable grid capacity in a remote community without immediate network reinforcement.

1 MW / 2 MWh

Increasing grid capacity with battery storage

The challenge

The local distribution network could not take additional load, which delayed new connections and electrification, including public fast charging. The conventional answer would have been a costly network reinforcement with a long lead time.

What we did

  • Defined the technical concept and system architecture for a grid-connected battery
  • Shaped the peak-shaving strategy and battery-to-EMS communication
  • Wrote the requirements, including factory acceptance testing (FAT)
  • Supported the procurement process
  • Designed the containerised installation and site safety

Outcome

  • A 1 MW / 2 MWh battery that behaves as part of the grid
  • More room for new load in the area
  • A faster route than conventional network reinforcement

Lesson

Limited grid capacity is becoming the main barrier to electrification. Batteries can unlock it faster than reinforcement.

Related services

Have a similar project in mind?

The first conversation is short and without obligation. Send us a line and we will work out what is needed.

Send an email
Email
enord@enord.is
Phone
840 4935
LinkedIn
Hrafn Leó Guðjónsson
Location
Reykjavík, Iceland