Electric truck charging

Electric trucks need more than a charger.

We design charging infrastructure for trucks, buses and fleets: the right grid connection, the right number of chargers and load management that keeps costs down. All based on real operations, not theoretical peak power.

What you get

Charging infrastructure in the right size

We design the number and power of chargers and the grid connection from the operation, no more and no less than needed.

Electrify now, not when the grid catches up

We show how much of the fleet the existing connection can already carry.

Every departure, fully charged

Vehicles charged and pre-heated before the first trip, summer and winter, planned around the timetable.

Lower power costs, every year

A lower peak means a smaller connection and lower capacity charges.

Two starting points

Not started yet

Get it right before you build. Chargers, power and grid connection are sized from the timetable, the equipment is bought once, and the site grows in phases.

Already charging

Add vehicles without a new grid connection, lower the peak and capacity charges, and test how resilient the current setup is.

We do not sell chargers or hardware, so the advice is based on your fleet, your operation and your depot.

Clients include

  • Strætó bs.
  • Orka náttúrunnar
  • RARIK
  • Reykjavíkurborg
  • Orkubú Vestfjarða
  • Kynnisferðir

Electrifying a fleet?

The first conversation is short and without obligation. Send us a line and we will work out what is needed.

Send an email
Email
enord@enord.is
Phone
840 4935
LinkedIn
Hrafn Leó Guðjónsson
Location
Reykjavík, Iceland