Selected projects

Examples of work for fleets, operators and utilities.

From 2 to 20 electric trucks in three phases

Regional haulage operator

From 2 to 20 electric trucks in three phases

Power requirements and phased build-out of charging infrastructure for a haulage operator electrifying its truck fleet step by step. One charging site at the main depot serves the whole fleet.

2 → 4 → 20 trucks · 315 A → 900 A

Depot charging infrastructure for 70 electric buses

Strætó bs. and Kynnisferðir

Depot charging infrastructure for 70 electric buses

Design of depot charging infrastructure for 70 electric buses, with 3.5 MW of power, on-site high-voltage distribution and three transformer stations. The work laid the technical basis for procurement.

3.5 MW · 70 buses · 3 transformer stations

Public tender for Charging-as-a-Service

Strætó bs.

Public tender for Charging-as-a-Service

Market survey and EEA tender for charging infrastructure and its operation as a service for Strætó's electric bus fleet. One of the first tenders of its kind in Iceland.

RFI · EEA tender

Truck fleet charging and public fast charging

Auðbert og Vigfús Páll ehf.

Truck fleet charging and public fast charging

Charging infrastructure for electrifying a truck fleet, designed so the same installation also serves as public fast charging for travellers and buses at a busy stop on Iceland's south coast.

Fleet + public charging

CPMS tender and backend strategy for a charging network

Orka náttúrunnar (ON Power)

CPMS tender and backend strategy for a charging network

Requirements, tender documents and evaluation model for a new backend for one of Iceland's largest charging networks, with a focus on stability, uptime and future services.

CPMS · tender

Peak shaving with solar and battery storage

Orka náttúrunnar (ON Power)

Peak shaving with solar and battery storage

Solar PV and a battery integrated with ON's fast-charging site at Bæjarháls to lower the peak on the grid connection and test the solution under Icelandic conditions.

100 kW PV · 466 kWh BESS

Increasing grid capacity with battery storage

RARIK

Increasing grid capacity with battery storage

System design, requirements and procurement of a 1 MW / 2 MWh battery that increases usable grid capacity in a remote community without immediate network reinforcement.

1 MW / 2 MWh

Electrifying a fleet?

The first conversation is short and without obligation. Send us a line and we will work out what is needed.

Send an email
Email
enord@enord.is
Phone
840 4935
LinkedIn
Hrafn Leó Guðjónsson
Location
Reykjavík, Iceland